THE OFFICE INDEX

Office profile

Oracle Headquarters & offices · Austin, Texas

Oracle's Austin Waterfront Campus lit up at night
The Austin Waterfront Campus at night, 2018 · DronePhotographer / CC0 · Wikimedia Commons
A yellow wall covered in Texas sayings in Oracle's Austin campus
A Texas-sayings wall, first building, 2018 · Asterisk Group (SEGD project page)
A wall of Topo Chico bottles spelling HOLA
“HOLA”, made of Topo Chico bottles, 2018 · Asterisk Group (SEGD project page)
A booth under a wall of speakers styled as a music equalizer
Speaker-equalizer wall, first building, 2018 · Asterisk Group (SEGD project page)
A Texas flag made of guitar picks
Texas flag made of 4,560 guitar picks, 2018 · Asterisk Group (SEGD project page)

See more of the office →

Oracle · Austin, Texas

A campus on Lady Bird Lake with balconies over the water and more than 250 art installations made with Texas artists.

The Austin Waterfront Campus, the benefits and 49 years of headquarters moves — from 900 sq ft in Santa Clara to the shore of Lady Bird Lake. Every number from Oracle's own filings, careers pages and the design team's project pages.

  • 560,000 sq ftfirst Austin building, opened 2018
  • 14 weekspaid parental leave (U.S.)
  • ≈ 8 yearsaverage employee tenure
  • 141,000full-time employees, May 2026

See inside the office Benefits

Sources: Oracle press release, Mar 22, 2018 · oracle.com/careers benefits · Form 10-K FY2026

Companies / United States / Enterprise software & cloud / Oracle

THE HEADQUARTERS · AUSTIN WATERFRONT CAMPUS

A lakeside campus where the walls are full of Texas

The first building has five levels of open office floors, cantilevered balconies and terraces looking over Lady Bird Lake and downtown Austin, and a floating stair and bridge in the lobby. Inside, the art and graphics are all about Texas: a slot-car track of the Circuit of the Americas, a “HOLA” sign made of 225 Topo Chico bottles, food trucks painted by 15 local artists and a flag made of 4,560 guitar picks. The second building, opened in December 2020, added more than 250 more installations, including 2,700 Matchbox cars and 366 cassette tapes.

  • 560,000 sq ft first building (≈ 52,026 m²)
  • Balconies over Lady Bird Lake
  • LEED Gold (first building)
  • Design: STG Design
  • Landscape: TBG Partners
  • 250+ art installations (second building)
A mosaic of Barton Springs pool behind a floating stair
Barton Springs mosaic by the dining area, 2018 · Asterisk Group (SEGD project page)
A wall of Texas food illustrations
“Bingo with a Twist”: Texas food, 2018 · Asterisk Group (SEGD project page)
Food trucks painted by local artists above café seating
Food trucks painted by Texas artists, 2018 · Asterisk Group (SEGD project page)
A wall of Topo Chico bottles
225 Topo Chico bottles, 2018 · Asterisk Group (SEGD project page)
Lounge seating under a wall of speakers
The music lounge, 2018 · Asterisk Group (SEGD project page)
A Texas flag made of guitar picks
Guitar-pick flag, 2018 · Asterisk Group (SEGD project page)

The second building, opened December 2020

More than 250 installations made with Texas artists, from Matchbox cars to cassette tapes.

Café seating under a wall sculpture made of pipes
A pipe sculpture over café tables, 2020–21 · © Oracle 2020–2021 (SEGD project page)
A blue wall of black silhouette portraits
A wall of silhouettes, 2020–21 · © Oracle 2020–2021 (SEGD project page)
A long corridor wall covered in lunch-themed lyrics
“How deep is your lunch”: a lyric wall, 2020–21 · © Oracle 2020–2021 (SEGD project page)

Redwood Shores, Oracle's home from 1989 to 2020

The round glass towers around a lagoon in Redwood City, the headquarters for 31 years.

Oracle's round glass towers across the lagoon in Redwood Shores
The towers across the lagoon, 2009 · Håkan Dahlström / CC BY 2.0 · Wikimedia Commons
Oracle towers reflected in the lagoon
Redwood Shores, 2012 · Davidlohr Bueso / CC BY 2.0 · Wikimedia Commons
A willow-lined walkway between Oracle towers
A walkway between the towers, 2008 · BrokenSphere / CC BY-SA 3.0 · Wikimedia Commons
Aerial view of Oracle's Redwood Shores campus
The campus from the air, 2011 · Rehman Abubakr / CC BY-SA 4.0 · Wikimedia Commons

Oracle offices around the world

Oracle's Aoyama Center tower in Tokyo
Oracle Aoyama Center, Tokyo, 2015 · Erikashimi / CC BY-SA 4.0 · Wikimedia Commons
Oracle buildings at Bagmane Tech Park, Bangalore, at night
Bagmane Tech Park, Bangalore, 2009 · Ajith Kumar / CC BY 2.0 · Wikimedia Commons
Oracle's office building in Amsterdam
Nieuwevaart, Amsterdam, 2019 · Steven Lek / CC BY-SA 4.0 · Wikimedia Commons
Oracle's office in Melbourne
Melbourne, 2023 · Shkuru Afshar / CC BY-SA 4.0 · Wikimedia Commons
Oracle Canada's office in Markham
Oracle Canada, Markham, 2019 · Raysonho @ Open Grid Scheduler / Scalable Grid Engine / CC0 · Wikimedia Commons
Oracle's office at 12320 Oracle Blvd, Colorado Springs
Colorado Springs, 2024 · Xnatedawgx / CC BY-SA 4.0 · Wikimedia Commons

Facts: Walter P Moore and Salas O'Brien project pages · SEGD project entries by Asterisk (phase 1 art collection; Austin Waterfront Campus: Phase 2) · Oracle press release, Mar 22, 2018.

The Austin Waterfront Campus

BuildingAddress
Austin Waterfront Campus (HQ, both office buildings)2300 Oracle Way, Austin, TX 78741

Source: Proxy statement 2026 · Form 10-K FY2021 cover · Texas Department of Licensing and Regulation project records · See them on the map ↓

ArchitectSTG Design
LandscapeTBG Partners
First building (2018)560,000 sq ft (≈ 52,026 m²)
Second building (Dec 2020)8 storeys · 420,000 sq ft (≈ 39,019 m²)
Whole campus1,000,000+ sq ft
Room forup to 10,000 people
CertificationLEED Gold (first building)

Source: Oracle press release, Mar 22, 2018 (size, capacity) · Salas O'Brien project page (560,000 sq ft) · Walter P Moore project page (LEED Gold, five office levels) · TDLR record “Waterfront Phase 2 – Core & Shell” (8-storey, 420,000 sq ft, STG Design) · SEGD Phase 2 entry (TBG Partners, 1M+ sq ft, Dec 2020 opening). The first building's area is given as 540,000–560,000 sq ft by different project partners; we use Oracle's figure.

Benefits (United States)

Parental leave14 weeks

Up to 14 weeks paid, on top of medical leave for childbirth.

Time off (salaried)Flexible

Flexible vacation for salaried, non-overtime-eligible staff. Others accrue 13 days a year, 18 after three years.

Holidays11 + winter break

11 paid holidays, and U.S. operations close between Christmas and New Year's Day.

401(k)50% match

On the first 6% you contribute; the match vests fully after four years.

Health costs80%

Oracle pays on average 80% of health benefit costs; coverage starts on the hire date.

Adoption & surrogacy$14,400

Adoption reimbursement per adoption; surrogacy up to $25,000 lifetime.

Counseling10 sessions

Free, confidential EAP sessions per concern each year, for you and your family.

Stock purchaseUp to 10%

Buy Oracle stock at a discount through payroll, up to 10% of eligible cash pay.

Source: oracle.com/careers benefits page (parental leave, volunteering, hybrid/remote options) · Oracle US Benefit Highlights PDF, Rev. Sep 13, 2024. Oracle doesn't state the ESPP discount rate in these documents.

Why people stay: what Oracle itself reports

≈ 8 yrsAverage tenure

31% of employees have been with Oracle for ten years or more.

4.2M hrsTraining in FY2026

Plus about 2.6 million views a month of online learning content.

20%Jobs filled from inside

Share of open non-entry-level positions filled internally in FY2026.

$5,250Tuition a year

Education reimbursement for work-related courses (U.S.).

105,000+Answer the engagement survey

Employees who took part in the annual engagement survey in FY2026.

40 hrsPaid volunteering

Up to 40 paid volunteer hours a year; Oracle also matches donations.

Source: Form 10-K FY2026, Human Capital Resources · oracle.com/careers benefits page · Oracle US Benefit Highlights (2024)

Who works here

Jobs · May 31, 2026 (141,000 people)
R&D 43,000Services 34,000Sales & marketing 25,000Cloud & software ops, hardware, G&A 39,000
141,000

full-time employees (May 31, 2026)

49,000

in the U.S.; 92,000 outside it

31%

have been at Oracle 10+ years

1977

founded, as Software Development Laboratories

Source: Form 10-K FY2026, Human Capital Resources · oracle.com/corporate

Office history: from 900 sq ft in Santa Clara to Lady Bird Lake

  1. 1977
    Santa Clara — a 900 sq ft office

    Larry Ellison, Bob Miner and Ed Oates founded Software Development Laboratories in 1977, in a 900 sq ft office in Santa Clara, California.

    Source: oracle.com/corporate (Oracle's own timeline)

    No free-to-use photo found yet.Have one? We’d love to add it.
  2. 1982
    The name becomes Oracle

    Software Development Laboratories became Relational Software Inc., and in 1982 was renamed Oracle Corporation. It listed on NASDAQ in 1986.

    Source: oracle.com/corporate

    No free-to-use photo found yet.Have one? We’d love to add it.
  3. 1989
    Redwood Shores — 500 Oracle Parkway

    Oracle moved to Redwood Shores, California, the year it joined the S&P 500. Its filings gave the headquarters address as 500 Oracle Parkway, Redwood City, for the next three decades.

    Source: oracle.com/corporate · Form 10-K 2011 and 2020, cover page

    Panorama of Oracle's Redwood Shores headquarters in 2005
    Redwood Shores from Marine World Parkway, 2005 · Peter Kaminski / CC BY 2.0 · Wikimedia Commons
  4. 2018
    A new campus in Austin

    Oracle opened a 560,000 sq ft building on the Lady Bird Lake waterfront in Austin, with room for up to 10,000 workers, dining, fitness, a training center, a conference center and an adjacent 295-unit apartment building.

    Source: Oracle press release, Mar 22, 2018

    Oracle's first Austin building at night
    The first Austin building, 2018 · DronePhotographer / CC0 · Wikimedia Commons
  5. 2020
    Austin becomes the headquarters

    In fiscal 2021 (December 2020) Oracle moved its headquarters to Austin. A second, eight-storey building on the same campus opened that December, and 2300 Oracle Way became the address on Oracle's filings.

    Source: Form 10-K FY2021 (cover page; “In fiscal 2021, we moved our headquarters to Austin, Texas”) · TDLR project record · SEGD Phase 2 entry

    Art wall in the second Austin building
    Inside the second building, 2020–21 · © Oracle 2020–2021 (SEGD project page)
  6. 2026
    Still at 2300 Oracle Way

    Oracle's 2026 proxy statement, for the November 18, 2026 annual meeting, gives the company's address as 2300 Oracle Way, Austin, Texas 78741.

    Source: Proxy statement 2026

    Texas-sayings wall inside the Austin headquarters
    Inside the Austin headquarters · Asterisk Group (SEGD project page)

Map: how the headquarters moved

Oracle spent its first 43 years on the San Francisco Peninsula, from Santa Clara to Redwood Shores, then moved its headquarters about 2,400 km east to a campus on Lady Bird Lake in Austin.

  1. 1 · 1977Santa Clara, California — First office, 900 sq ft (Oracle doesn't publish the street address; marker at the city centre)
  2. 2 · 1989500 Oracle Parkway, Redwood City — Redwood Shores headquarters until 2020
  3. 3 · 20202300 Oracle Way, Austin — Austin Waterfront Campus — headquarters today

Addresses: oracle.com/corporate · Form 10-K 2011, 2020 and 2021 cover pages · Proxy statement 2026

What Oracle does

Oracle began as a database company. Today it sells cloud infrastructure and cloud applications, plus database and other software, hardware and services, to businesses and governments.

Revenue is reported as Cloud, Software (license and support), Hardware and Services.

Where the money came from · revenue by type, FY2026

CloudInfrastructure (OCI) and applications (SaaS)
$34.0B
SoftwareLicenses and support
$24.5B
ServicesConsulting and other services
$5.7B
HardwareServers, storage and systems
$3.1B

Source: Oracle Q4 and fiscal 2026 results release, Form 8-K Exhibit 99.1 (June 10, 2026)

Revenue, FY2026$67.4Bup 17% in a year
Net income, FY2026$17.1BGAAP
Remaining performance obligations$638Bat May 31, 2026, up 363%
Revenue per employee$478K$67.4B ÷ 141,000

Source: Oracle Q4 and fiscal 2026 results release (June 10, 2026) · Form 10-K FY2026 (employees) · per-employee figure calculated by eciffo

Growth: revenue vs. people

1.7×revenue, FY2021 → FY2026
$40.5B → $67.4B
1.07×employees, same years
132,000 → 141,000
YearRevenueEmployees
FY2021
$40.5B
132,000
FY2022
$42.4B
143,000
FY2023
$50.0B
164,000
FY2024
$53.0B
159,000
FY2025
$57.4B
162,000
FY2026
$67.4B
141,000

Fiscal years end May 31. Revenue: Oracle full-year results releases (Form 8-K Exhibit 99.1, FY2022, FY2024, FY2026). Employees: Form 10-K, approximate full-time headcount. Multiples calculated by eciffo.

Chief executives

No free-to-use photo.
2025 – today
Clay Magouyrk

CEO, alongside Mike Sicilia.

No free-to-use photo.
2025 – today
Mike Sicilia

CEO, alongside Clay Magouyrk.

No free-to-use photo.
2014 – 2025
Safra Catz

CEO from 2014; now Executive Vice Chair of the Board.

Co-founders: Larry Ellison, Bob Miner and Ed Oates. Ellison is Chairman of the Board and Chief Technology Officer.

Source: Oracle press release, Sep 22, 2025 · oracle.com/corporate/executives · oracle.com/corporate

Oracle's official social accounts

Oracle's official accounts, as linked from oracle.com and its careers pages.

Oracle: questions people ask

Where is Oracle's headquarters?

At 2300 Oracle Way, Austin, Texas 78741 — the Austin Waterfront Campus on Lady Bird Lake. Oracle moved its headquarters there from Redwood Shores, California, in fiscal 2021 (December 2020), and its 2026 proxy statement still gives this address.

Source: Form 10-K FY2021 · Proxy statement 2026

Who designed Oracle's Austin campus?

STG Design was the architect and interior designer, and TBG Partners designed the landscape. The design studio Asterisk created the art and graphics programme.

Source: SEGD project entries · TDLR project records

How big is Oracle's Austin headquarters?

The first building, opened in 2018, is about 560,000 sq ft (≈ 52,026 m²). The second, an eight-storey building of about 420,000 sq ft, opened in December 2020. Together the campus has more than 1 million sq ft and room for up to 10,000 people.

Source: Oracle press release, Mar 22, 2018 · TDLR · SEGD Phase 2 entry

Where was Oracle founded?

In a 900 sq ft office in Santa Clara, California, in 1977, as Software Development Laboratories. It moved to Redwood Shores in 1989.

Source: oracle.com/corporate

What benefits does Oracle offer?

In the U.S.: up to 14 weeks of paid parental leave, flexible vacation for salaried staff, 11 paid holidays plus a winter close, a 401(k) match of 50% on the first 6%, up to 40 paid volunteer hours a year, adoption reimbursement up to $14,400 and 10 free counseling sessions per concern each year.

Source: oracle.com/careers benefits page · Oracle US Benefit Highlights (2024)

Does Oracle offer remote or hybrid work?

Oracle's U.S. careers benefits page lists “hybrid or remote work options” alongside paid time off and flexible sick time. Arrangements depend on the role.

Source: oracle.com/careers benefits page

How many people work at Oracle?

About 141,000 full-time employees at May 31, 2026 — about 49,000 in the U.S. and 92,000 elsewhere. The largest group, 43,000, works in research and development.

Source: Form 10-K FY2026

How long do people stay at Oracle?

Oracle says average tenure is about eight years, and 31% of employees have been with the company ten years or more.

Source: Form 10-K FY2026

Who is Oracle's CEO?

Clay Magouyrk and Mike Sicilia, both promoted to CEO in September 2025. Safra Catz, CEO since 2014, became Executive Vice Chair; co-founder Larry Ellison is Chairman and CTO.

Source: Oracle press release, Sep 22, 2025

You have seen the office, the benefits and the pay

Want to work at Oracle?

See open jobs on Oracle's careers site ↗

Or keep exploring: compare these benefits and offices with other companies below.

Oracle in our features

Open jobs at Oracle ↗

You may also like

Photos are credited to their source. If you hold the rights or represent Oracle and want a photo changed or removed, contact us. Updated 2026-10-10.