THE OFFICE INDEX

Office profile

ASML Headquarters & offices · Veldhoven, Netherlands

A glass pavilion in a green plaza between ASML's De Run 1000 office buildings
The glass plaza pavilion, De Run 1000 · Photo: © Scagliola + Brakkee | ASML · EGM architecten
A long interior street with wood shelving, plants and brick walls
Inside De Run 1000 · Photo: © Scagliola + Brakkee | ASML · EGM architecten
A white atrium with balconies under a skylight
The atrium · Photo: © Scagliola + Brakkee | ASML · EGM architecten
A lounge with round red sofas and paper pendant lamps
A lounge on the plaza level · Photo: © Scagliola + Brakkee | ASML · EGM architecten
White office buildings around a green courtyard
The green courtyard · Photo: © Scagliola + Brakkee | ASML · EGM architecten

See more of the office →

ASML · Veldhoven, Netherlands

Four new office buildings for 4,000 people, joined by a glass plaza and roof gardens with beehives — on the very spot where ASML's first Veldhoven building opened in 1985.

The campus, the Dutch benefits and 40 years of office history — then the pay. Every number from ASML's own annual report, remuneration report, careers site and the architects' project pages.

  • ≈ 4,000workstations in the 2025 office buildings
  • 40 dayspaid leave a year (Netherlands)
  • 143nationalities
  • 4.1%attrition in 2025

See inside the office Benefits

Sources: ASML 2025 Annual Report · asml.com campus page and Netherlands compensation & benefits page · EGM architecten project page

Companies / Netherlands / Semiconductor equipment / ASML

THE NEWEST OFFICES · DE RUN 1000 · 2025

Four office buildings around a green, glass-walled plaza

Opened in April 2025, De Run 1000 is four related office buildings — each with slightly different façades — linked by a 4,000 m² plaza with a fully glazed front and greenery all around. Floor-to-ceiling windows and a central void pull daylight deep inside; mostly white rooms get bright colour accents, warm materials and cabinets that double as green partitions. On the roofs: gardens with beehives and insect hotels. EGM says the design swings between focus and relaxation, like the body's nervous system.

  • 47,880 m² (≈ 515,376 sq ft)
  • ≈ 4,000 workstations
  • BREEAM Excellent · WELL Platinum
  • Design: EGM architecten
  • Landscape: Karres en Brands
  • ≈ 30% more energy-efficient than the norm
A café counter with plants and tall windows
Café corner · Photo: © Scagliola + Brakkee | ASML · EGM architecten
An atrium with white balconies and red sofas
Atrium lounge · Photo: © Scagliola + Brakkee | ASML · EGM architecten
Workspaces among wood columns and brick
Work area · Photo: © Scagliola + Brakkee | ASML · EGM architecten
A café bar with round tables
Coffee bar · Photo: © Scagliola + Brakkee | ASML · EGM architecten
A double-height glass hall
Glass hall · Photo: © Scagliola + Brakkee | ASML · EGM architecten
Long wooden tables in a tall glazed space
Meeting tables · Photo: © Scagliola + Brakkee | ASML · EGM architecten
A wood-lined entrance hall
Entrance hall · Photo: © Scagliola + Brakkee | ASML · EGM architecten
An atrium with a blue wall and seating
Atrium · Photo: © Scagliola + Brakkee | ASML · EGM architecten
A yellow-walled lounge with sofas
Team lounge · Photo: © Scagliola + Brakkee | ASML · EGM architecten
High desks by tall windows
Standing desks · Photo: © Scagliola + Brakkee | ASML · EGM architecten

Four buildings and a plaza

EGM architecten designed De Run 1000 as four office buildings joined by a 4,000 m² plaza with a glass pavilion; Karres en Brands did the landscape.

A glass bridge between buildings over the garden
Glass link over the garden · Photo: © Scagliola + Brakkee | ASML · EGM architecten
A white office building with planting
One of the four buildings · Photo: © Scagliola + Brakkee | ASML · EGM architecten
The courtyard
The courtyard · Photo: © Scagliola + Brakkee | ASML · EGM architecten

Facts: EGM architecten project page “ASML, high-tech offices” · asml.com campus page · Karres en Brands opening news (April 2025). Photos are added later with credit; we remove any photo on request.

The Veldhoven campus

BuildingAddress
Global headquartersDe Run 6501, 5504 DR Veldhoven, Netherlands
De Run 1000 (four office buildings and plaza)De Run 1000, Veldhoven, Netherlands

Source: asml.com Veldhoven location page and campus page · EGM architecten project page · See them on the map ↓

Architect, De Run 1000EGM architecten
Campus vision & landscapeKarres en Brands with SmitsRinsma (2019)
De Run 1000 floor area47,880 m² (≈ 515,376 sq ft)
Central plaza4,000 m² (≈ 43,056 sq ft)
De Run 1000 openedApril 8, 2025
CertificationBREEAM Excellent · WELL Platinum
Logistics hub & offices (2022)Broekbakema · 34,000 m² of offices (≈ 365,973 sq ft) for about 3,000 people
Experience Center (2016)≈ 500 m² · Tinker Imagineers

Source: asml.com campus page · EGM architecten · Karres en Brands · Deerns (smart building with Signify) · Broekbakema · Tinker project pages

Benefits (Netherlands)

Paid leave40 days

27 vacation days plus 13 ADV days (shorter working time). Up to 80 extra hours can be bought each year.

Holiday allowance8%

8% of annual salary, paid every June.

13th month8.33%

8.33% of annual salary, paid every December.

Share purchase plan+20%

Buy ASML shares from net salary or sold leave days; hold them one year for a one-time 20% gross premium.

Health insurance50%

ASML pays half the premium for the additional health package, for employees, partners and children.

Long-term illness2 years

Full salary for up to two years of illness, with reintegration support.

Hybrid work2 days

Work from home up to two days a week where the job allows; up to 20 working days a year from abroad.

CyclingBike plan

Buy a regular or electric bike through salary exchange, plus a bicycle reward for campus staff who cycle 0–20 km.

Source: asml.com Careers, “Compensation and benefits” and “The Netherlands at a glance” (2026). Differences by salary grade and position may apply. Parental leave is not described on these pages.

Why people stay: what ASML itself reports

4.1%Attrition in 2025

About 4 in every 100 employees left during the year (2024: 3.8%), against ASML's own ceiling of 7%.

78.9%Engagement score

Three-year rolling average from ASML's employee survey; the inclusion score was 80.2%.

+20%Share premium

Employees in the Netherlands who buy ASML shares and hold them for a year get a one-time 20% gross premium.

StudiesGlobal Training and Studies

Educational assistance for courses and degrees, alongside in-house training.

2 daysRemote work a week

Where the job allows, plus up to 20 working days a year from abroad (Netherlands policy).

€1,750Given per employee

Invested in local communities in 2025, including employee giving and volunteering (2024: €1,084).

Source: ASML 2025 Annual Report (sustainability key figures) · asml.com compensation & benefits (Netherlands)

Who works here

Where people work · end of 2025 (44,209 FTE)
Netherlands 23,546Asia 10,075United States 8,317Germany & other 2,271
Gender · 2025 (headcount)
Women 21%Men and others 79%
143

nationalities

16,000+

people in R&D

29%

of new hires in 2025 were women

37%+

of employees cycle to the Veldhoven campus

Source: ASML 2025 Public Country-by-Country Report (FTE by country, Dec 31, 2025; Asia = Taiwan, Korea, China, Japan, Singapore, Malaysia) · 2025 Annual Report (gender, nationalities, R&D, inflow of women) · asml.com campus page (cycling)

Pay at ASML

Average employee · personnel cost per FTE, 2025€153,000

Wages, social security, pension and share-based pay (€6,612.8M) divided by 43,267 average payroll FTEs. The CEO earned 46 times this amount. ASML publishes an average, not a median.

Source: ASML 2025 Remuneration Report, pp. 22–23

Pay by ageNot published

ASML does not report pay by age. The average cost per employee, above, is the closest official number.

Office history: from a shed next to Philips to a second 350,000 m² campus

  1. 1984
    Strijp, Eindhoven — a Philips building and a leaky shed

    ASM Lithography was set up on April 1, 1984 by Philips and ASM International. 47 engineers from Philips' wafer-stepper group joined. The start-up began in Philips' Strijp TQ building in Eindhoven, soon outgrew it and added “some uncomfortable sheds” next to a Philips office.

    Source: asml.com: “ASML's founding story” (2024) and company history

    Aerial view of the Philips Strijp factory complex in the 1930s
    The Philips Strijp works, Eindhoven, 1930s · Eindhoven / Public domain · Wikimedia Commons
  2. 1985
    Veldhoven — the first own office and factory

    With about 100 employees, ASML moved into a newly built office and factory in Veldhoven, a few kilometres from the Philips research labs. Veldhoven was chosen for the permanent head office.

    Source: asml.com company history · founding story

    Low ASML office building in Veldhoven
    ASML in Veldhoven, 2008 · HHahn / CC BY-SA 3.0 · Wikimedia Commons
  3. 1996
    The factory complex grows at De Run

    After going independent and listing in 1995, ASML expanded R&D and production at De Run. A staged factory complex began in 1996, with offices built on top of the cleanrooms and a parking garage in two 250-metre sections; it won the Dutch National Steel Prize in 2012.

    Source: asml.com company history · Arcadis project page

    ASML's tower at De Run, Veldhoven, in 2008
    De Run, Veldhoven, 2008 · A ansems / Public domain · Wikimedia Commons
  4. 2016
    An Experience Center at the heart of the campus

    A 500 m² visitor centre opened, styled like a cleanroom, with a full-size EUV machine projection and a timeline of ASML since 1985. Visitors come by invitation.

    Source: Tinker Imagineers news, Sept 21, 2016

    No free-to-use photo found yet.Have one? We’d love to add it.
  5. 2019
    A plan for a green campus

    Landscape architects Karres en Brands, with SmitsRinsma, were commissioned to draw up a vision for a green campus and the layout of its new outdoor spaces.

    Source: Karres en Brands news, April 2025

    No free-to-use photo found yet.Have one? We’d love to add it.
  6. 2022
    A logistics hub with offices on its roof

    A 30,000 m² automated logistics hub with a 35-metre warehouse was completed, topped by 34,000 m² of offices for about 3,000 people around two atriums, with a roof garden and 1,780 solar panels.

    Source: Broekbakema project page “ASML Logistics Hub and Offices”

    No free-to-use photo found yet.Have one? We’d love to add it.
  7. 2025
    De Run 1000 — back where it began

    Four office buildings for about 4,000 people opened on April 8, 2025, on the site of ASML's first Veldhoven building from 1985 (the former white ASML building).

    Source: Karres en Brands news · asml.com campus page · EGM architecten

    De Run 1000
    De Run 1000, 2025 · Photo: © Scagliola + Brakkee | ASML · EGM architecten
  8. 2026
    Ground broken for a second campus in Eindhoven

    On September 8, 2026 ASML broke ground at Brainport Industries Campus North in Eindhoven: about 350,000 m² when complete, up to 20,000 workplaces, and a first phase for at least 3,000 people due in 2029. Veldhoven stays the headquarters.

    Source: ASML press release, Sept 8, 2026

    No free-to-use photo found yet.Have one? We’d love to add it.

Map: how the headquarters moved

From a shed beside Philips in Eindhoven to De Run in Veldhoven, about 6 km south-west. Since 1985 ASML has stayed on the same road — and its newest offices stand where its first Veldhoven building did.

  1. 1 · 1984Strijp, Eindhoven — Philips' Strijp TQ building and the sheds beside it
  2. 2 · 1985De Run, Veldhoven — First own office and factory; the site of De Run 1000 since 2025
  3. 3 · TodayDe Run 6501, Veldhoven — ASML global headquarters

Places: asml.com founding story, company history, campus and Veldhoven pages · Karres en Brands · Locations approximate, from the addresses

What ASML does

ASML builds the lithography machines chipmakers use to print circuit patterns onto silicon wafers — EUV and DUV systems — plus metrology and inspection tools, software, and service for the machines already in customers' fabs.

Sales come from new and used systems (EUV, DUV, metrology & inspection) and from Installed Base Management — service and upgrades for machines in the field.

Where the money came from · Net sales by product, 2025

DUV systemsDeep-ultraviolet lithography; 279 systems
€12.0B
EUV systemsExtreme-ultraviolet lithography; 48 systems
€11.6B
Installed Base ManagementService and upgrades for machines in the field
€8.2B
Metrology & InspectionMeasuring and inspecting wafers
€0.8B

Source: ASML Q4 and full-year 2025 results press release and investor presentation (Jan 28, 2026)

Total net sales, 2025€32.7Bup 15.6% in a year
Net income, 2025€9.6BUS GAAP
R&D spending, 2025€4.7B2024: €4.3B
Sales per employee€739K€32,667M ÷ 44,209 FTE

Source: ASML Q4 and full-year 2025 results press release · 2025 Annual Report · per-employee figure calculated by eciffo with the FTE count from the 2025 Country-by-Country Report

Growth: revenue vs. people

2.8×net sales, 2019 → 2025
€11.8B → €32.7B
1.13×employees (FTE), 2022 → 2025
39,086 → 44,209
YearRevenueEmployees
FY2019
€11.8B
—
FY2020
€14.0B
—
FY2021
€18.6B
—
FY2022
€21.2B
39,086
FY2023
€27.6B
42,416
FY2024
€28.3B
44,027
FY2025
€32.7B
44,209

Calendar years. Net sales: Q4 2020 results release (2019–2020) and Q4 2025 investor presentation (2021–2025). Employees (FTE, year-end): Form 20-F 2022, 2023, 2024 and the 2025 Country-by-Country Report; earlier year-end counts were not found in a form we could confirm. Multiples calculated by eciffo.

Chief executives

No free-to-use photo.
2024 – today
Christophe Fouquet

President and CEO since April 25, 2024. Joined ASML in 2008 in marketing and product management; led EUV from 2018 and became Chief Business Officer in 2022.

No free-to-use photo.
2013 – 2024
Peter Wennink

Joined in 1999 as CFO; President and CEO from July 1, 2013 until April 2024.

Founded in 1984 as ASM Lithography, a joint venture of Philips and ASM International (ASMI).

Source: asml.com “Introducing Christophe Fouquet, ASML's new CEO” (2024) · ASML Foundation supervisory board page · company history

Hear it from the CEO

ASML's official social accounts

Accounts linked from ASML's investor website.

ASML: questions people ask

Where is ASML's headquarters?

At De Run 6501, 5504 DR Veldhoven, the Netherlands. Veldhoven is ASML's biggest R&D and manufacturing site and houses the Board of Management and global corporate functions.

Source: asml.com Veldhoven location page

How many people work at ASML?

44,209 full-time equivalents at the end of 2025, from 143 nationalities. 23,546 of them work in the Netherlands.

Source: ASML 2025 Country-by-Country Report · 2025 Annual Report

Who designed ASML's new office buildings?

EGM architecten designed De Run 1000, the four office buildings around a central plaza that opened in April 2025. Karres en Brands, with SmitsRinsma, made the green-campus vision and outdoor layout.

Source: EGM architecten · Karres en Brands

How big is De Run 1000?

47,880 m² (about 515,000 sq ft) of floor space with about 4,000 workstations, linked by a 4,000 m² plaza. It is rated BREEAM Excellent and WELL Platinum.

Source: asml.com campus page · EGM architecten

Can you visit ASML's campus?

The Experience Center on the Veldhoven campus admits visitors by invitation. ASML also holds annual Open House days where the public can learn about its campus plans.

Source: Tinker Imagineers (2016) · asml.com campus page

What benefits does ASML offer in the Netherlands?

40 days of paid leave (27 vacation + 13 ADV days), an 8% holiday allowance, a 13th month of 8.33%, a share purchase plan with a 20% premium after one year, half the premium of the additional health package, and a bike plan.

Source: asml.com compensation and benefits

Does ASML allow remote or hybrid work?

In the Netherlands, employees can work remotely up to two days a week if the job allows it, and work from abroad for up to 20 working days a year.

Source: asml.com compensation and benefits

What is ASML's employee attrition rate?

4.1% in 2025 (2024: 3.8%), below ASML's own target of under 7%.

Source: ASML 2025 Annual Report

Is ASML building a new campus?

Yes. Construction began on September 8, 2026 at Brainport Industries Campus North in Eindhoven: about 350,000 m² and up to 20,000 workplaces, with a first phase for at least 3,000 people due in 2029.

Source: ASML press release, Sept 8, 2026

Who is ASML's CEO?

Christophe Fouquet, President and CEO since April 25, 2024. He succeeded Peter Wennink, CEO from 2013.

Source: asml.com

You have seen the office, the benefits and the pay

Want to work at ASML?

See open jobs on ASML's careers site ↗

Or keep exploring: compare these benefits and offices with other companies below.

ASML in our features

Open jobs at ASML ↗

You may also like

Photos are credited to their source. If you hold the rights or represent ASML and want a photo changed or removed, contact us. Updated 2026-10-10.